Q1
MCQ[1 Mark]
As per the Mohs scale of hardness, the correct sequence is
GATE→2026→Mining Geology, Mine Development and Surveying→Mining Geology
Q2
MCQ[1 Mark]
The igneous intrusion along the bedding plane of the coal seam, as indicated by P, is known as
Figure for Question 2
GATE→2026→Mining Geology, Mine Development and Surveying→Mining Geology
Q3
MCQ[2 Marks]
Match the type of rock with its metamorphic form.
GATE→2025→Mining Geology, Mine Development and Surveying→Mining Geology
Q4
MCQ[2 Marks]
Match the type of deposit with the corresponding process of formation
GATE→2023→Mining Geology, Mine Development and Surveying→Mining Geology
Q5
MCQ[1 Mark]
The fault pattern shown in the figure is a case of
Figure for Question 5
GATE→2022→Mining Geology, Mine Development and Surveying→Mining Geology
Q6
MCQ[1 Mark]
Match the rock with its metamorphosed form

Mine Development

15 Questions
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Development
Q7
MCQ[1 Mark]
The best combination of explosive and initiation system for underwater blasting for rock breakage is
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Development
Q8
MCQ[1 Mark]
The firing sequence in a drivage is shown. The charge per hole for Sections 1, 2, and 3 are 2.0 kg, 3.0 kg, and 1.0 kg, respectively, and the delay between each section is 25 milliseconds. The maximum charge per delay, in kg, is
Figure for Question 8
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Development
Q9
MCQ[2 Marks]
Match the shaft sinking method with its applicability.
GATE→2025→Mining Geology, Mine Development and Surveying→Mine Development
Q10
NAT[1 Mark]
An HMX explosive having Velocity of Detonation (VOD) of 10500 m/s10500\text{ m/s} is tested by D'Autriche method with a detonating fuse of VOD 7000 m/s7000\text{ m/s}, as shown in the figure. The impression mark on lead plate will be obtained at a distance (L), in m, from the midpoint of the fuse, is
Figure for Question 10
GATE→2025→Mining Geology, Mine Development and Surveying→Mine Development
Q11
NAT[2 Marks]
In a surface mine, blasting is carried out using electronic detonator and cartridge emulsion explosive with following details: Burden = 3.5 m, Spacing = 4.5 m, Bench height = 10.0 m, Subgrade drilling = 1.0 m, Stemming = 4.0 m, Linear charge concentration = 16 kg/m, Cost of one detonator = Rs. 800, Cost of explosive = Rs. 30/kg. The cost of blasting material per cubic meter of blasted rock, in Rs., is (rounded off to 2 decimal places)
GATE→2024→Mining Geology, Mine Development and Surveying→Mine Development
Q12
NAT[1 Mark]
An explosive with a density of 1.2 g/cm31.2\text{ g/cm}^{3} has a heat of explosion equal to 900 cal/g900\text{ cal/g}. If the heat of explosion of ANFO with density of 0.8 g/cm30.8\text{ g/cm}^{3} is 950 cal/g950\text{ cal/g} the bulk strength of the explosive relative to ANFO is
GATE→2024→Mining Geology, Mine Development and Surveying→Mine Development
Q13
NAT[1 Mark]
In a VCR stope, blast holes of 165 mm diameter are drilled. For the blast hole to behave as a spherical charge, the maximum charge length, in m, is
GATE→2024→Mining Geology, Mine Development and Surveying→Mine Development
Q14
NAT[1 Mark]
A rectangular development heading of dimension 3 m×2.83\text{ m}\times2.8 m is to be blasted with holes of 2.4 m in length. If the pull factor is 0.95 and swell factor is 1.20, the volume of blasted rock per round, in m3\text{m}^{3}, is
GATE→2023→Mining Geology, Mine Development and Surveying→Mine Development
Q15
MCQ[1 Mark]
The blast pattern of a coal face shown in the figure represents
Figure for Question 15
GATE→2023→Mining Geology, Mine Development and Surveying→Mine Development
Q16
NAT[2 Marks]
A surface mine blast pattern has spacing 4 m and burden 3 m. The diameter of the drill hole is 110 mm. The drilling length is 8.8 m including subgrade of 10%. The bulk explosive density is 900 kg/m3900\text{ kg}/\text{m}^{3}. If the powder factor is 2.5 m3/kg2.5\text{ m}^{3}/\text{kg}, the charge length in m is [rounded off to 2 decimal places]
GATE→2022→Mining Geology, Mine Development and Surveying→Mine Development
Q17
MCQ[1 Mark]
The drilling technique applicable for mineral exploration is
GATE→2022→Mining Geology, Mine Development and Surveying→Mine Development
Q18
MCQ[1 Mark]
A square pattern of blasting is shown in the figure. For the case of simultaneous blast, identify the zone of no fragmentation
Figure for Question 18
GATE→2022→Mining Geology, Mine Development and Surveying→Mine Development
Q19
MCQ[2 Marks]
Match the drilling pattern with mining operation
Figure for Question 19
GATE→2022→Mining Geology, Mine Development and Surveying→Mine Development
Q20
NAT[2 Marks]
Following information is given for a drilling operation to be carried out for overburden removal in a surface mine... The amount of explosive per unit length of charge in kg/m is
GATE→2022→Mining Geology, Mine Development and Surveying→Mine Development
Q21
NAT[2 Marks]
The oxygen-balanced equation for explosive ANFO is given below. 3NH4NO3+CH2→7H2O+CO2+3N23NH_{4}NO_{3}+CH_{2}\rightarrow 7H_{2}O+CO_{2}+3N_{2}. For 100 litre of fuel oil having density 850 kg/m3850\text{ kg}/\text{m}^{3} the amount of ammonium nitrate to be mixed, in kg, is

Mine Surveying

19 Questions
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Surveying
Q22
MCQ[1 Mark]
In remote sensing, the order of the wavelength bands of electromagnetic radiation used for data acquisition is
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Surveying
Q23
NAT[1 Mark]
A circular curve having radius of curvature 1000 m is set out by connecting two straights with a deflection angle of 60∘60^{\circ}. The apex distance, in m, is
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Surveying
Q24
MCQ[2 Marks]
The observations from a correlation survey are shown. If coordinates of C and D are (East: 375 m, North: 1120 m) and (East: 376 m, North: 1121 m), the whole circle bearing of the line EF is
Figure for Question 24
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Surveying
Q25
NAT[2 Marks]
Following observations were taken using a Tacheometer with staff held vertical. Additive and multiplying constants are 0 and 100. The reduced level (RL) of staff station R, in m, is
Figure for Question 25
GATE→2025→Mining Geology, Mine Development and Surveying→Mine Surveying
Q26
MCQ[1 Mark]
A non-transit theodolite does NOT have
GATE→2025→Mining Geology, Mine Development and Surveying→Mine Surveying
Q27
MCQ[1 Mark]
Match the source of error with the corresponding correction in surveying with steel tape.
GATE→2025→Mining Geology, Mine Development and Surveying→Mine Surveying
Q28
MCQ[2 Marks]
Based on the theodolite survey for a closed traverse PQRS, the following bearings are observed for the sides of the traverse... The interior angles at P and R respectively are
GATE→2025→Mining Geology, Mine Development and Surveying→Mine Surveying
Q29
NAT[2 Marks]
A pit slope has the following information: Number of benches = 5, Height of each bench = 8 m, Bench slope angle = 70 degree. If width of one bench is 24 m and that of other four benches is 10 m each, the overall pit slope angle, in degree, is (rounded off to 2 decimal places)
GATE→2025→Mining Geology, Mine Development and Surveying→Mine Surveying
Q30
NAT[2 Marks]
Reciprocal levelling is performed for points P and Q by placing the same levelling instrument at A and B. The observations of staff readings are tabulated as below... If the Reduced Level (RL) of P is 115.246 m, then the true RL of Q, in m, is (rounded off to 3 decimal places)
GATE→2024→Mining Geology, Mine Development and Surveying→Mine Surveying
Q31
MCQ[1 Mark]
Match the following features with the corresponding symbols in mine plan
GATE→2024→Mining Geology, Mine Development and Surveying→Mine Surveying
Q32
MCQ[2 Marks]
In a closed traverse, ABC, bearings and lengths given. The missing quantities are...
GATE→2024→Mining Geology, Mine Development and Surveying→Mine Surveying
Q33
NAT[2 Marks]
In a tacheometry survey, the readings observed are given... The length of the line AB in m, is
GATE→2023→Mining Geology, Mine Development and Surveying→Mine Surveying
Q34
MCQ[1 Mark]
Match the following items with their respective contours
GATE→2023→Mining Geology, Mine Development and Surveying→Mine Surveying
Q35
MCQ[1 Mark]
In an astronomical survey at a given station, the pole star is located at an angle of 27∘27^{\circ} from the horizon. The latitude of the survey station in degrees is
GATE→2023→Mining Geology, Mine Development and Surveying→Mine Surveying
Q36
MCQ[1 Mark]
The position tracking of a point by GPS is based on the technique of
GATE→2023→Mining Geology, Mine Development and Surveying→Mine Surveying
Q37
MCQ[2 Marks]
Match the following devices with their intended applications.
GATE→2023→Mining Geology, Mine Development and Surveying→Mine Surveying
Q38
NAT[2 Marks]
Coordinate of two points A and B are (E 0 m, N 200 m) and (E 300 m, N 200 m), respectively. The bearing of two lines AO and BO are 67∘67^{\circ} and 35∘35^{\circ}, respectively. The easting of point O, in m, is [rounded off to 2 decimal places]
GATE→2022→Mining Geology, Mine Development and Surveying→Mine Surveying
Q39
NAT[1 Mark]
In a levelling survey, a reading is taken as 2.25 m. However, along the line of sight there is deflection of 20 cm with respect to vertical position of the staff. The correct reading, in m is
GATE→2022→Mining Geology, Mine Development and Surveying→Mine Surveying
Q40
NAT[2 Marks]
The shaft-top coordinates of two vertical shafts... The downward gradient of the line joining the bottom of the two shafts in degrees, is