In a surface mine, blasting is carried out using electronic detonator and cartridge emulsion explosive with following details: Burden = 3.5 m, Spacing = 4.5 m, Bench height = 10.0 m, Subgrade drilling = 1.0 m, Stemming = 4.0 m, Linear charge concentration = 16 kg/m, Cost of one detonator = Rs. 800, Cost of explosive = Rs. 30/kg. The cost of blasting material per cubic meter of blasted rock, in Rs., is (rounded off to 2 decimal places)