Suresh said, "I did it yesterday." Which one of the following options is the correct form of this sentence in indirect speech?
GATE→2026→General Aptitude→Quantitative Aptitude
Q2
MCQ[1 Mark]
To continue the sequence of tiles shown, the tile indicated by the question mark should be
GATE→2026→General Aptitude→Quantitative Aptitude
Q3
MCQ[1 Mark]
Consider an art gallery whose walkways are shown as lines in the diagram. A black dot represents a junction of two walkways. A guard may be placed at a junction to watch over the walkways that join at that junction. The minimum number of guards needed to watch all the walkways is
GATE→2026→General Aptitude→Quantitative Aptitude
Q4
MCQ[1 Mark]
The 2nd of June is a Thursday in a certain year. Which day of the week is the 3rd of July in that year?
GATE→2026→General Aptitude→Quantitative Aptitude
Q5
MCQ[1 Mark]
A coin with heads facing up is shown as H and a coin with tails facing up is shown as T. Six coins are placed in the Starting Arrangement (H H H T T T). The minimum number of steps needed to go from the Starting Arrangement to the Final Arrangement (T T T H H H) is
GATE→2026→General Aptitude→Verbal Ability
Q6
MCQ[2 Marks]
Exacerbate : Mitigate :: Choose the option with the correct pair of words to fill the blank.
GATE→2026→General Aptitude→Quantitative Aptitude
Q7
MCQ[2 Marks]
A paper shown in Panel I is folded along the dashed lines to construct a cube. Referring to cubes shown in Panel II, which one of the options is correct?
GATE→2026→General Aptitude→Quantitative Aptitude
Q8
MCQ[2 Marks]
In a population, patients who have high cholesterol also have high blood-pressure (BP). Some patients with high BP also have diabetes. There are no patients who have both high cholesterol and diabetes. Furthermore, 1) total patients with at least one condition = 75, 2) high cholesterol = 10, 3) high BP = 45, 4) only high BP and no other conditions = 20. The number of patients who have both diabetes and high BP is
GATE→2026→General Aptitude→Quantitative Aptitude
Q9
MCQ[2 Marks]
Four people P, Q, R, and S, of different ages, make the following observations. P: I am younger than S. Q: I am neither the youngest nor the oldest. R: P is older than me. Based on these observations, the youngest person is
GATE→2026→General Aptitude→Quantitative Aptitude
Q10
MCQ[2 Marks]
Circles C1, C2, and C3, with centers O1, O2, and O3, and radii r1, r2, and r3, respectively, touch each other as shown. Given r1=2 cm, r2=1 cm and the angle ∠O1O3O2 is 90∘, r3= cm.
Engineering Mathematics
9 Questions
GATE→2026→Engineering Mathematics→Linear Algebra
Q11
MCQ[1 Mark]
If I is an identity matrix, the polynomial equation that satisfies the Cayley-Hamilton theorem for the matrix P=[2013] is
GATE→2026→Engineering Mathematics→Vector Calculus
Q12
MCQ[1 Mark]
Let i^ and j^ be the unit vectors in the x and y direction, respectively. The divergence (∇⋅F) of F=x2yi^+y3xj^ at the point (3,2) is
Given the data in the Table, Newton's divided difference interpolation polynomial is y=b0+b1(x−2)+b2(x−2)(x−2.5). If the values of b0 and b1 are 3 and 1, respectively, then the value of b2 is
GATE→2026→Engineering Mathematics→Linear Algebra
Q18
MCQ[2 Marks]
Given x=121,b=−16−37,P−1=ef−1−69−2−7118 and Px=b. If Py=d and d=−1607, the value of y2 is
GATE→2026→Engineering Mathematics→Probability and Statistics
Q19
NAT[2 Marks]
Using linear regression (least squares), the best-fit line for the given dataset is y=2.2x+2.3. Given the residual sum of squares is 25.8, the coefficient of determination (r2) is
Mining Geology, Mine Development and Surveying
10 Questions
GATE→2026→Mining Geology, Mine Development and Surveying→Mining Geology
Q20
MCQ[1 Mark]
As per the Mohs scale of hardness, the correct sequence is
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Development
Q21
MCQ[1 Mark]
The best combination of explosive and initiation system for underwater blasting for rock breakage is
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Development
Q22
MCQ[1 Mark]
The firing sequence in a drivage is shown. The charge per hole for Sections 1, 2, and 3 are 2.0 kg, 3.0 kg, and 1.0 kg, respectively, and the delay between each section is 25 milliseconds. The maximum charge per delay, in kg, is
GATE→2026→Mining Geology, Mine Development and Surveying→Mining Geology
Q23
MCQ[1 Mark]
The igneous intrusion along the bedding plane of the coal seam, as indicated by P, is known as
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Surveying
Q24
MCQ[1 Mark]
In remote sensing, the order of the wavelength bands of electromagnetic radiation used for data acquisition is
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Surveying
Q25
NAT[1 Mark]
A circular curve having radius of curvature 1000 m is set out by connecting two straights with a deflection angle of 60∘. The apex distance, in m, is
GATE→2026→Mining Geology, Mine Development and Surveying→Mining Geology
Q26
MCQ[2 Marks]
Match the type of rock with its metamorphic form.
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Development
Q27
MCQ[2 Marks]
Match the shaft sinking method with its applicability.
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Surveying
Q28
MCQ[2 Marks]
The observations from a correlation survey are shown. If coordinates of C and D are (East: 375 m, North: 1120 m) and (East: 376 m, North: 1121 m), the whole circle bearing of the line EF is
GATE→2026→Mining Geology, Mine Development and Surveying→Mine Surveying
Q29
NAT[2 Marks]
Following observations were taken using a Tacheometer with staff held vertical. Additive and multiplying constants are 0 and 100. The reduced level (RL) of staff station R, in m, is
Geomechanics and Ground Control
9 Questions
GATE→2026→Geomechanics and Ground Control→Engineering Mechanics
Q30
MCQ[1 Mark]
A simply supported beam is shown. The location at which the zero shear force is acting on the beam is
GATE→2026→Geomechanics and Ground Control→Geomechanics
Q31
MCQ[1 Mark]
In a Slake Durability Index (SDI) test, a rock sample of 500 g undergoes two standard cycles of wetting and drying. The mass of the sample retained after the test is 400 g. The SDI of the sample, in %, is
GATE→2026→Geomechanics and Ground Control→Geomechanics
Q32
MCQ[1 Mark]
Results from the permeability test of rock samples, E, F, and G are shown. The correct order of hydraulic conductivity (k) of the rock samples is
GATE→2026→Geomechanics and Ground Control→Geomechanics
Q33
MCQ[2 Marks]
The in-situ stresses are determined by Flat-jack method by making three slots (P, Q, and R) on the wall (ABCD) of a mine gallery as shown. If σP>σQ and σR=0, the shear stress on the wall is
GATE→2026→Geomechanics and Ground Control→Ground Control
Q34
NAT[2 Marks]
A plug dam is to be constructed in a mine gallery of size 3.5 m×2.5 m. The interfacial shear strength between surrounding rock and plug dam is 1.0 MPa. The minimum thickness of the dam, in m, to withstand a water pressure of 10.0 MPa is
GATE→2026→Geomechanics and Ground Control→Ground Control
Q35
NAT[2 Marks]
In a bench blasting, 49 kg of explosive is put in each hole. The PPV at a distance of 100 m, in mm s−1, is
GATE→2026→Geomechanics and Ground Control→Engineering Mechanics
Q36
NAT[2 Marks]
A truss PQR carries vertical load of 10 kN at Q as shown. The force in member PR, in kN, is
GATE→2026→Geomechanics and Ground Control→Engineering Mechanics
Q37
NAT[2 Marks]
Two blocks P and Q weighing 100 kN and 200 kN, respectively, are connected by a string passing through a frictionless pulley. Friction coefficient between P and Q is 0.4, and between Q and surface is 0.3. The minimum force, F, in kN, required to pull the block Q, is
GATE→2026→Geomechanics and Ground Control→Geomechanics
Q38
NAT[2 Marks]
In a uniaxial compressive strength test, a 120Ω strain gauge of gauge factor 2.0 is pasted on the rock sample as shown. At the end of the test, the change in resistance of the strain gauge is 0.5Ω. The longitudinal deformation of the sample, in mm, is
Mining Methods and Machinery
9 Questions
GATE→2026→Mining Methods and Machinery→Mining Machinery
Q39
MCQ[1 Mark]
The ideal load - deformation characteristic curve of a hydraulic prop is
GATE→2026→Mining Methods and Machinery→Mining Methods
Q40
MCQ[1 Mark]
A 20 m thick orebody is dipping at an angle of 75∘. The orebody and host rock are strong. It is proposed to deploy a 150-200 mm diameter drill for production. The suitable stoping method is
GATE→2026→Mining Methods and Machinery→Mining Machinery
Q41
NAT[1 Mark]
The shaft of a motor rotating at 50 rev s−1 is uniformly retarded to 20 rev s−1 in 15 s. The number of complete rotations the shaft makes in the given time is
GATE→2026→Mining Methods and Machinery→Mining Machinery
Q42
NAT[1 Mark]
A belt is wrapped around a pulley as shown. The coefficient of friction between the belt and pulley is 0.3. If there is no slippage between the belt and pulley, the angle of wrap (θ), in degrees, is
GATE→2026→Mining Methods and Machinery→Mining Machinery
Q43
NAT[2 Marks]
A rake of wagons, with inter-wagon gap of 100 cm, is moving at a speed of 0.4 km per hour under a silo loading system. The dimensions of the wagon are 8 m(L)×3 m(W)×3 m(H). Considering fill factor 0.95 and bulk density 1.2 tonne/m3, the loading rate of the silo, in tonne per hour, is
GATE→2026→Mining Methods and Machinery→Mining Machinery
Q44
NAT[2 Marks]
A turbine pump is designed to generate water head of 60 m. The impeller speed of the pump is 2000 rpm and the manometric efficiency is 70%. Neglecting impeller blade curvature, the impeller diameter of the pump, in cm, is
GATE→2026→Mining Methods and Machinery→Mining Methods
Q45
NAT[2 Marks]
The information for a dragline operation is given: Bucket capacity: 20 m3, Fill factor: 0.9, Digging and filling time: 20 s, Swinging time: 32 s, Dumping time: 10 s, Utilization: 90%. The output of the dragline, in m3h−1, is
GATE→2026→Mining Methods and Machinery→Mining Methods
Q46
NAT[2 Marks]
A regular shaped cut and fill stope is shown. Pillars of size 4 m×4 m are left at an interval of 13 m along the length of the stope. If density is 2.5 tonne/m3, the total tonnage of ore recovered from the 1st slice of the stope (in ×103 tonnes) is
GATE→2026→Mining Methods and Machinery→Mining Machinery
Q47
NAT[2 Marks]
A coal seam of 2.4 m thickness is mined with a DERD shearer at a cutting speed of 0.6 km h−1. The web depth of the cut is 0.5 m. The average cross-sectional area of coal on the AFC during transportation is 0.24 m2. For evacuation of cut coal from face with 10% spillage, the required minimum velocity of the AFC, in m s−1, is
Surface Environment, Mine Ventilation and Underground Hazards
10 Questions
GATE→2026→Surface Environment, Mine Ventilation and Underground Hazards→Mine Ventilation
Q48
MCQ[1 Mark]
A gradually expanding duct fitted to the outlet of an exhaust fan is known as
GATE→2026→Surface Environment, Mine Ventilation and Underground Hazards→Underground Hazards
Q49
MCQ[1 Mark]
The cobweb-like appearance in the radiograph of the lung of a miner can be diagnosed as
GATE→2026→Surface Environment, Mine Ventilation and Underground Hazards→Underground Hazards
Q50
MCQ[1 Mark]
In firedamp explosion, the methane concentration in the stoichiometric methane-air mixture, in % by volume, is (Assume air contains 79% nitrogen and 21% oxygen, by volume).
GATE→2026→Surface Environment, Mine Ventilation and Underground Hazards→Mine Ventilation
Q51
NAT[1 Mark]
In an underground mine, an airflow of 30 m3/s is delivered through a circular opening having a diameter of 5 m and a length of 500 m. Assuming that there is no change in the surface characteristics, the diameter of the opening, in m, required to double the quantity of airflow at same pressure loss is
GATE→2026→Surface Environment, Mine Ventilation and Underground Hazards→Mine Ventilation
Q52
NAT[1 Mark]
In an underground mine atmosphere, the alcohol of a Kata thermometer took 60 s to fall from 38∘C to 35∘C. The Kata factor of the thermometer is 480 milli-calories cm−2. The Kata cooling power, in W m−2, is
GATE→2026→Surface Environment, Mine Ventilation and Underground Hazards→Mine Ventilation
Q53
MCQ[2 Marks]
In an underground coal mine, the air quantities QA and QB pass through ventilation districts A and B, respectively, with a pressure drop of ΔP across them. The air quantity in district B is to be increased to QB′ by installing a booster fan without affecting district A. The capacity of booster fan (PB) can be expressed as
GATE→2026→Surface Environment, Mine Ventilation and Underground Hazards→Underground Hazards
Q54
NAT[2 Marks]
A closed-circuit self-contained breathing apparatus (SCBA) contains 2 liters of O2 at 200 bar. If a miner consumes O2 at a rate of 2 liters min−1, the maximum duration that the apparatus can supply O2, in min, is
GATE→2026→Surface Environment, Mine Ventilation and Underground Hazards→Mine Ventilation
Q55
NAT[2 Marks]
A main mechanical ventilator installed for an underground mine develops a pressure of 25 mm wg. A natural ventilation pressure (NVP) of 15 mm wg acting in the mine aids the ventilator, and a total 500 m3min−1 of air is circulated. Considering the same NVP aiding, the pressure required, in mm wg, to be generated by the ventilator to circulate 1000 m3min−1 of air is
GATE→2026→Surface Environment, Mine Ventilation and Underground Hazards→Surface Environment
Q56
NAT[2 Marks]
Dust particles from a blasting operation rise up in the atmosphere to a height of 500 m. The viscosity of air is 1.80×10−5 kg m−1s−1. Assume quiescent settling. The settling time, in days, of a dust particle of 2.5μm diameter and 3600 kg m−3 density is
GATE→2026→Surface Environment, Mine Ventilation and Underground Hazards→Surface Environment
Q57
NAT[2 Marks]
In a biochemical oxygen demand (BOD) test, 15 ml of wastewater sample was diluted with distilled water to completely fill a 300 ml BOD bottle and incubated at 20∘C for 5 days. The dissolved oxygen (DO) level before and after incubation are 9.2 mg liter−1 and 4.4 mg liter−1, respectively. The BOD of the sample, in mg liter−1, is
Mineral Economics, Mine Planning, Systems Engineering
8 Questions
GATE→2026→Mineral Economics, Mine Planning, Systems Engineering→Mineral Economics
Q58
MCQ[1 Mark]
As per the UNFC mineral resources classification system, the highest category of resource is indicated by
GATE→2026→Mineral Economics, Mine Planning, Systems Engineering→Systems Engineering
Q59
NAT[1 Mark]
The expected time (P days) and standard deviation (Q days) of the different activities (A to F) in a project are indicated in the network diagram as (P,Q). The standard deviation of the project completion time, in days, is
GATE→2026→Mineral Economics, Mine Planning, Systems Engineering→Systems Engineering
Q60
MCQ[2 Marks]
A shovel needs to be selected from four models of different capacities, S1 to S4, for loading of dumpers. The operational data for the shovel-dumper combination are provided. Mean arrival rate = 5 per hour, dumper waiting cost = 200 per hour. Shovel type with minimum total cost is
GATE→2026→Mineral Economics, Mine Planning, Systems Engineering→Mine Planning
Q61
NAT[2 Marks]
The borehole data for resource estimation for an iron ore deposit are shown. The average grade of the deposit, in %, is
GATE→2026→Mineral Economics, Mine Planning, Systems Engineering→Systems Engineering
Q62
NAT[2 Marks]
A mine workshop needs to assign 4 jobs to 4 service engineers. The cost for performing a job by an individual service engineer is given. If service engineer S1 cannot perform J3, and S3 cannot perform J4, the optimal cost for completion of jobs is
GATE→2026→Mineral Economics, Mine Planning, Systems Engineering→Mineral Economics
Q63
NAT[2 Marks]
A shovel costing P=20 crores has a salvage value S=2 crores with a useful life n=10 years. The annual depreciation is evaluated using declining balance method. The depreciated cost of the shovel, in crores, in its 2nd year is
GATE→2026→Mineral Economics, Mine Planning, Systems Engineering→Mine Planning
Q64
NAT[2 Marks]
An economic block model along with extraction sequence is shown. If the discount rate is 10%, the net present value (NPV), in lakhs, is
GATE→2026→Mineral Economics, Mine Planning, Systems Engineering→Mine Planning
Q65
NAT[2 Marks]
A bord and pillar panel has 24 developed pillars of size 40 m×40 m (centre to centre) under extraction. Gallery width = 4 m, extraction height = 3 m, extraction ratio during depillaring = 80%, specific gravity of coal = 1.4, incubation period = 6 months, average working days per month = 25. In order to extract the panel within the incubation period, the minimum rate of production, in tonne per day, is